Oracle Primavera v22.12.0.0

Download & activate Oracle Primavera P6 EPPM 22.12.0.0 for Windows (1 year license). Advanced project portfolio management. Get it now!

Contact the Author

Please Sign In To Contact This Author

Features of Oracle Primavera P6 EPPM 22.12.0.0:

  • Enterprise Project Portfolio Management (EPPM): Manage projects, programs, and portfolios of any size with centralized data.
  • Multi-User & Scalable Database: Robust architecture supporting multiple users and large-scale projects and portfolios across an enterprise.
  • Advanced Scheduling & Planning: Develop detailed project schedules, manage resources, and track progress with critical path method (CPM) scheduling.
  • Resource Management: Plan, schedule, and control resources with resource leveling, role-based resource assignment, and utilization analysis.
  • Cost Management: Track project costs, forecast expenditures, and manage budgets to ensure financial control.
  • Risk Management: Identify, assess, and mitigate project risks, with tools for risk analysis and response planning.
  • Reporting & Analytics: Generate powerful reports, dashboards, and customizable layouts for comprehensive project insights.
  • Visualizer: A dedicated tool for creating time-scaled logic diagrams and Gantt charts.
  • Timesheets: Integrated timesheet functionality for collecting and approving actual hours spent on activities.
  • Project Methodologies: Support for various project methodologies, including Waterfall, Agile, and Hybrid approaches.
  • Integration Capabilities: Integrates with other enterprise systems like ERP, financial, and asset management software.
  • Collaboration Tools: Facilitate communication and collaboration among project teams.
  • Contract Management: Manage contracts and subcontracts, including change orders and invoicing.

System Requirements (Estimated for Oracle Primavera P6 EPPM 22.12.0.0 for Windows - Client Workstation):

  • Operating System: Windows 11 (64-bit), Windows 10 (64-bit).
  • Processor: Intel Core i5 or AMD equivalent (recommended: Intel Core i7 or faster, AMD Ryzen 7 or faster).
  • RAM: 8 GB RAM minimum (recommended: 16 GB RAM or more, especially for working with large project files).
  • Disk Space: 5 GB or more of available disk space for installation (recommended: SSD for better application responsiveness).
  • Display: 1280 x 1024 resolution minimum (recommended: 1920 x 1080 or higher).
  • Database Client: Oracle Client 19c or Microsoft SQL Server client tools for database connectivity (depending on EPPM database choice).
  • Web Browser: Microsoft Edge, Mozilla Firefox, Google Chrome (latest versions).
  • Internet Connection: Required for licensing, updates, and access to an EPPM server deployment.
  • Microsoft Office: Microsoft Excel and Project for import/export functionality.

Note: For the full Enterprise Project Portfolio Management (EPPM) functionality, Primavera P6 requires a server-side deployment (e.g., Application Server, Database Server) with its own more extensive system requirements. These listed requirements are primarily for a client workstation connecting to an existing EPPM system or for standalone (Professional) client installation.

Related Products

CSi Bridge 24.2.0

CSi Bridge 24.2.0

0Sales
$40
Top